MacKay River Plant
Overview
MacKay River is an industrial cogeneration project that is situated on Suncor’s MacKay River oilsands development, 60 km (37 miles) northwest of Fort McMurray, Alta. The cogeneration plant is an integral part of Suncor’s bitumen extraction facilities.
The project uses a General Electric 7FA combustion turbine equipped with a dry low NOx combustion system to maximize fuel efficiency and minimize air emissions.
In order to deliver the large quantities of steam required by Suncor, the MacKay River project uses one of the largest Enhanced Oil Recovery HRSGs ever built.
TransCanada Energy Ltd participates in Alberta’s competitive electricity market.
An integral part of Suncor’s bitumen extraction facilities
Natural gas-fired combustion turbine
Produces steam for injection wells
Documents and maps
The MacKay River Cogeneration Plant located near Fort McMurray, Alta., is part of Suncor’s bitumen extraction facilities. The plant also produces close to 200 megawatts of energy for Alberta communities.
How are we regulated?
TC Energy's Alberta power-generation plants and business is governed according to regulations outlined by the Alberta Utilities Commission (AUC).
Alberta Utilities Commission (AUC) | ||
---|---|---|
Calgary 403-592-8845 |
Ways to reach us
If you have any questions about the Project, please reach out to us via the contact information below.
MacKay River Plant (TC Energy) | ||
---|---|---|
MacKay River Plant (TC Energy) |
Jamie Draper |
Emergency Response | |
---|---|
Our commitment to the safety of our people, pipelines and facilities is unwavering, visit our Contact page for our complete list of emergency numbers. |
Media Relations | |
---|---|
TC Energy welcomes enquiries from media. Please direct questions to: | |
1-800-608-7859 Toll-free (North America) | media@airllevant.com |
Investor Relations | |
---|---|
We welcome inquiries from analysts, shareholders and prospective shareholders at: | |
1-800-361-6522 Toll-free (North America) | investor_relations@airllevant.com |